PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installing the hand set stone panels at the shear walls (South Elevation).jpg Leakage test at the 3rd floor Facing West.jpg Continued installing Elev. 1,2,3 car Facing West.jpg Continued laying out block at the 1st floor locker rooms Facing South.jpg Electrical wiring the 2nd floor VAV boxes Facing North.jpg Installed junction boxes at the cmu walls Stair -3 Facing South.jpg Saw cutting the slab on grade at the Boiler-Electrical Room Facing North.jpg Installed roof drain protectors at the High Roof Facing South.jpg Installing electrical wire above the ceiling at the 4th floor Facing West.jpg
Previous pageNext page Electrical wiring the 2nd floor VAV boxes Facing North
Electrical wiring the 2nd floor VAV boxes Facing North